0416 506 198
Over 440 km of road shoulder constructed and final trimmed.
Construct pavement with foam-based bitumen to design and final trim.
Taxiway and internal access road construction.
Gain access through rugged terrain safely and assist with backfill and rehabilitation.
Construct 20 km of road — condition material — improve alignment — final trim for spray seal.
Formation through low-lying areas to meet specified elevations for flood events.
Build elevated grain bunkers to design allowing for significant drainage solutions for surrounding towns.
This job involved shoulder construction and final trim work for Tatiara Road, Wirrega North Road and Pigeon Flat Roads in preparation for spray seal.